Project duration:

2 months

Client:

Large manufacturer of pharmaceutical dispensing products.

Project summary:

Assessment of assembly and packaging line, consisting of machinery designed by the client but manufactured by external suppliers.

Applicable Directives:

Machinery, EMC

What we did:

  • Detailed assessment of the design of all of the equipment in the line against applicable CE marking regulations and harmonised standards.
  • Listed required content for Technical File and reviewed existing documentation in order to identify gaps in documentation.
  • Identified non compliances and advised on modifications to mechanical and electrical design to achieve compliance.

What the customer did:

  • Supplied us with detailed mechanical and electrical design drawings for assessment.
  • Undertook the design of necessary modifications and collated the Technical File and most of the content.

Final outcome:

The customer made the relevant modifications to the production line and updated their documentaion.

 

 

How Can We Help You?

Page Contact form

Ask a question, or request a callback.
Please type your full name.

Invalid email address.

Invalid Input

Test description

Invalid Input

Invalid Input

Please make a selection

Invalid Input

Invalid Input

Conformance is Trading Globally

colour map4

Conformance Offices

Head Office

Great Hucklow
Buxton
Derbyshire
SK17 8RG
United Kingdom

Tel: +44 (0)1298 873800
Fax: +44 (0)1298 873801
E-mail: cemark[at]conformance.co.uk

Lancaster

2 Lodge Cottages
Thurnham
Lancaster
LA2 0DT
United Kingdom

Tel: +44 (0)1298 873800

Go To Top